D. place the breaker box against power supply cage, Figure216 replacing the power breaker box, Replace the ac distribution unit – Sun Microsystems 2000E User Manual

Page 32: Figure 2-16, Replacing the power breaker box

Advertising
background image

2-16

SPARCserver 2000E Power Supply Installation ManualApril 1995

2

d. Place the breaker box against power supply cage.

Align the captive screws with the bottom two holes in the top power
supply. See Figure 2-16.

e. Loosely thread the two captive screws at the top of the breaker box into

holes in the top power supply.

f. Loosely thread two screws through holes in the bottom lip of the

breaker box into holes in the bottom power supply.

g. Tighten all four screws to secure the power breaker box in place.

Note – Ensure the filter cable does not become crimped between the breaker
box and the power supply cage.

Figure 2-16 Replacing the Power Breaker Box

3. Replace the AC distribution unit.

a. Place the power distribution unit against the chassis with all four holes

aligned with those in the chassis.

Captive screws (2 places)

Screws (2 places, hidden)

Advertising