8 2nd transfer roller cleaning operation timing, 2nd transfer roller cleaning operation timing -54 – Konica Minolta 5430 DL 5440 DL 5450 User Manual

Page 91

Advertising
background image

2nd Transfer Section

Main Unit Theory of Operation

2-54

II Comp

osition

/O

p

eration

9.2.8

2nd Transfer Roller cleaning operation timing

• The 2nd Transfer Roller cleaning sequence is carried out after the Intermediate Transfer

Belt has been cleaned during recovery from a media misfeed or malfunction.

• The cleaning sequence is carried out if 100 printed pages are produced after the last

cleaning sequence.

• The cleaning sequence is carried out when a media size error occurs.

1.

The 2nd Transfer Roller is pressed.

2.

The 2nd transfer bias voltage of reverse polarity is applied for the period of time corre-
sponding to one revolution of the 2nd Transfer Roller.

3.

The 2nd transfer bias voltage of forward polarity is applied for the period of time corre-
sponding to one revolution of the 2nd Transfer Roller.

4.

Steps 2 and 3 are repeated five times.

5.

The 2nd Transfer Roller is retracted.

2nd Transfer Roller

2nd transfer bias (reverse polarity)

2nd transfer bias (forward polarity)

Pressed

Retracted

4138to2148e0

5430DL_5440DL_5450_TO_PDF.book 54 ページ 2005年4月12日 火曜日 午後4時49分

Advertising