Test procedures, F-11, Main transformer test – Lincoln Electric POWER MIG SVM167-A User Manual

Page 47: Main transformer, Test, The main transformer, Troubleshooting and repair, Warning

Advertising
background image

TROUBLESHOOTING AND REPAIR

F-11

F-11

POWER MIG® 215

TEST DESCRIPTION

This test will determine if the correct voltages are being applied.
a. Applied to the primary windings of the Main Transformers.
b. Induced on the secondary and auxiliary windings of the Main Transformer.

MATERIALS NEEDED

3/8” Nutdriver
5/16” Nutdriver
Volt-ohmmeter

MAIN TRANSFORMER TEST

Service and repair should only be performed by Lincoln Electric factory trained
personnel. Unauthorized repairs performed on this equipment may result in
danger to the technician or machine operator and will invalidate your factory
warranty. For your safety and to avoid electrical shock please observe all safety
notes and precautions detailed throughout this manual.

If for any reason you do not understand the test procedures or are unable to
perform the test/repairs safely, contact the Lincoln Electric service department
for technical troubleshooting assistance before you proceed. Call 1-888-935-
3877.

WARNING

Return

to

Section

T

OC

Return

to

Section

T

OC

Return

to

Section

T

OC

Return

to

Section

T

OC

Return

to

Master

T

OC

Return

to

Master

T

OC

Return

to

Master

T

OC

Return

to

Master

T

OC

Advertising