Patterson-Kelley MACH-05 User Manual

Page 13

Advertising
background image

MACH® Series

Gas-Fired Boiler

Installation

Page 9

WARNING!

Do not locate intake or exhaust terminations
directly above a walkway; dripping of conden-
sation can cause icing of the walking surface.


Reference: ANSI Z223.1 - 2002

Sidewall Installations


Rooftop Installations

3.6.4 Vent Terminations

Vent Termination Details


The vent should extend at least three (3) feet above
the roof, or at least two (2) feet above the highest part
of any structure within ten (10) feet of the vent.

To prevent the possible re-circulation of flue gases,
your vent designer must take into consideration such
things as prevailing winds, eddy zones, building
configurations, etc. P-K can not be responsible for
the effects such adverse conditions may have on the
operation of the boilers. Dimensions listed above or
those illustrated are minimum, and may or may not be
sufficient for conditions at a specific job site.

A tee must be of approved design and adequate
capacity.

3.6.5 Venting for Multiple Boilers

The venting instructions in this manual apply to a
single boiler.

Venting systems for multiple boilers must be
designed by qualified professionals and verified by
the stack manufacturer. The venting system must
prevent backflow of exhaust gas through idle
boilers which are not operating.

No rain cap

required,

or Tee.

Centering

Support Plate

Sealant

Outside Plate

Cover Plate
Fastener

Sealant

12" min.

Recommended

Termination

(see text below)

Mechanical draft vent

terminal

12 in.
min.

Direct vent terminal
clearance minimum 12 in.

12 in.

min

Mechanical draft

vent terminal

12 in.
min.

4 ft.
min.

Less
than
10 ft.

4 ft.
min.

Forced

air inlet

3 ft min.

Grade

10' min.

4' min.

Flue Gas

Outlet

Combustion

Air Inlet

4' min above

snow line

Advertising