Page 12

C750/900/1050 Sidewall Inlet and Vent


3.6.9 Intake Duct Materials and Sizes:

Material: PVC, CPVC (Schedule 40), single wall
galvanized steel, or other suitable materials.

The intake duct must be sized for a maximum pressure
drop of 0.22 inches W.C., for the SCFM as specified
below.

Boiler Size

Required SCFM

1050 245

900 210

750 175

450 105

300 70

The installation of a bird screen on the intake
termination is recommended.

3.6.10 Sealing the Intake Duct

Proper sealing of the intake ductwork is necessary to
prevent infiltration of air from conditioned space.
Joints in PVC or CPVC must be cemented. For
galvanized duct, wrap each joint and seam with
adhesive aluminum tape.

3.6.11 Intake Duct Connection to Boiler

Connect the air supply duct to the collar on the back of
the boiler. Fasten the duct to the collar with sheet
metal screws at 90º angles. Seal the joint.

3.6.12 Intake Duct Terminations

The roof intake termination must be an
unrestrictive type, as shown above.

Roof

Round

90° Elbow

Sidewall

Round

Air Inlet
(tee mounted
horizontally)

No rain cap -

Unrestricted

Sidewall

Air inlet
(Down Elbow
Mounted)

Exhaust Vent
(Sidewall
Venting
Requires Up
Elbow Mounted)