PowerTec OMRG25204 User Manual

Page 99

Advertising
background image

Lubrication & Maint./2000 Hour/24 Month

OURGP11,000000C

–19–24JUN04–3/3

11. After cleaning the cooling system, drain cleaner and

fill with water to flush the system. Run the engine
about 10 minutes, remove radiator cap and pull off
lower radiator hose to drain out flushing water.

12. Close all drain valves on engine and radiator.

Reinstall radiator hose and tighten clamps securely.
Install thermostats using a new gasket. (See
TESTING THERMOSTATS OPENING
TEMPERATURE later in this section.)

IMPORTANT: Air must be expelled from cooling

system when system is refilled. Loosen
temperature sending unit fitting at rear
of cylinder head or plug in thermostat
housing to allow air to escape when
filling system. Retighten fitting or plug
after filling cooling system.

NOTE: Coolant capacity may vary depending on

application.

13. Add coolant to radiator until coolant touches bottom of

filler neck. (See specification for capacity.) Install
radiator cap.

Specification

4.5 L Engine— Coolant Capacity

8.5 L (9 qt)

.............................................

6.8 L Engine—Coolant Capacity

11.3 L (12 qt)

..........................................

14. Run engine until it reaches operating temperature.

This mixes the solution uniformly and circulates it
through the entire system. The normal engine coolant
temperature range is 82

°

—94

°

C (180

°

— 202

°

F).

15. After running engine, check coolant level and entire

cooling system for leaks.

16. Inspect the fan belt for wear and check belt tension.

(See Checking Belt Tensioner Spring Tension and
Belt Wear in Lubrication and Maintenance 500
Hour/12 Month section.

40-6

110306

PN=99

Advertising