Section 15: troubleshooting, 1 general, Section 15 – Roberts Gorden COMBAT CTU 22 TO 115 User Manual

Page 38: Warning, Roberts gordon

Advertising
background image

COMBAT

®

CTU U

NIT

H

EATERS

I

NSTALLATION

O

PERATION

AND

S

ERVICE

M

ANUAL

32

SECTION 15: TROUBLESHOOTING

15.1 General

If problems persist, contact

ROBERTS GORDON

®

at

Tel: +44(0)121 506 7709

www.rg-inc.com

Heater Operating

TROUBLESHOOT ENDS. No

Check for mis-wiring.

Change time delay relay.

Check time delat relay. Is

there 230 V accross brown

and blue wires?

Yes

No

No

Yes

Check limt thermostat(s);

Reset.

No

No

Use 15.2 to test burner.

Yes

Yes

Use 15.2 to test burner.

Is Red lockout

warning light on?

Yes

No

Turn on supplies.

Are gas & electrical

supplies on?

No

Yes

Start

With external controls on,

does the burner continue

to fire?

Is distribution air fan

operating?

WARNING

Explosion Hazard

Installation must be done by a registered installer/

contractor qualified in the installation and service of

gas-fired heating equipment or your gas supplier.

Failure to follow these instructions can result in death,

injury or property damage.

For your safety and optimum heater performance, use only ROBERTS GORDON

®

replacement parts.

Conduct Commissioning procedure as shown

on Page 24, Section 11.

Installation Code and Annual Inspections: All
installations and service of

ROBERTS

GORDON

®

equipment must be performed by a

contractor qualified in the installation and service
of equipment sold and supplied by Roberts-
Gordon and conform to all requirements set forth
in the

ROBERTS GORDON

®

manuals and all

applicable governmental authorities pertaining to
the installation, service and operation of the
equipment.
To help facilitate optimum performance and safety,
Roberts-Gordon recommends that a qualified
contractor annually inspect your

ROBERTS

GORDON

®

equipment and perform service

where necessary, using only replacement parts
sold and supplied by Roberts-Gordon.

Advertising