Warning, Heater – Roberts Gorden COMBAT CTU 22 TO 115 User Manual

Page 51

Advertising
background image

WARNING

© 2007 Roberts-Gordon, LLC www.rg-inc.com Printed in U.S.A.

P/N 91040028 Rev B

Attach this information to the wall near the ROBERTS GORDON

®

heater

Read the Installation, Commissioning, Operation and Service Manual thoroughly before installation, operation or service.

OPERATING INSTRUCTIONS

1. STOP! Read all safety instructions on this information sheet.

2. Open the manual gas valve in the heater supply line.

3. Turn on electric power to the heater.

4. Set the thermostat to desired setting (above ambient temperature).

The automatic starting sequence begins.

NOTE: Following long shutdown periods, the burner control may go to

to 'LOCKOUT' during the start sequence. Push the reset button to

recommence firing. Contact service department if 'LOCKOUT'

continues (see manual for details).

1. Turn the thermostat/time switch to 'OFF'. The burner will turn 'OFF'

immediately, but fans will continue to cool heat exchanger until the fan

thermostat switches off.

1. Set the thermostat to off or the lowest setting.

2. Turn off electric power to the heater.

3. Turn off the manual gas valve in the heater supply line.

4. Call your registered installer/contractor qualified in the installation

and service of gas-fired heating equipment.

IF THE HEATER WILL NOT OPERATE, TO ENSURE YOUR SAFETY,

FOLLOW THESE INSTRUCTIONS TO SHUT DOWN YOUR HEATER

Fire Hazard

Some objects can catch fire or explode when placed

close to heater.

Keep all flammable objects, liquids and vapors the

required clearances to combustibles away from heater.

Failure to follow these instructions can result in death,

injury or property damage.

TO TURN OFF THE HEATER

Fax: +44(0)121 506 7701

Service Telephone: +44(0)121 506 7709

Service Fax: +44(0)121 506 7702

E-mail: [email protected]

E-mail: [email protected]

Roberts-Gordon, LLC

1250 William Street

P.O. Box 44

Buffalo, NY 14240-0044 USA

Roberts-Gordon Europe Limited

Unit A, Kings Hill Business Park

Darlaston Road, Wednesbury

West Midlands WS10 7SH UK

Telephone: +44(0)121 506 7700

®

50 cm

50 cm**

30 cm

15 cm

Clearances to Combustibles

15 cm

2.5 - 3.5 m*

3 m

60 cm

Wall

Terminal

Roof Terminal

Air

Intake

Flue

Installation Clearances

**80 cm is necessary to service heater.

Installation Code and Annual Inspections:

All installations and service of ROBERTS GORDON

®

equipment must be performed by a contractor qualified in the installation and service of equipment sold and supplied by Roberts-Gordon and

conform to all requirements set forth in the ROBERTS GORDON

®

manuals and all applicable governmental authorities pertaining to the installation, service and operation of the equipment. To help

facilitate optimum performance and safety, Roberts-Gordon recommends that a qualified contractor annually inspect your ROBERTS GORDON

®

equipment and perform service where necessary,

using only replacement parts sold and supplied by Roberts-Gordon.
For installations at elevations above 2000' (610 m), the appliance shall be derated 4% for each 1000' (305 m) of elevation above sea level.

Further Information:Applications, engineering and detailed guidance on systems design, installation and equipment performance is available through ROBERTS GORDON

®

representatives.

Please contact us for any further information you may require, including the Installation, Commissioning, Operation and Service Manual.

These products are not for residential use.

Telephone: 716.852.4400

Fax: 716.852.0854

Toll Free: 800.828.7450

*Heaters may be mounted at a higher level if destratification

fans and/or turn down nozzles are installed.

SECTION 16: R

EMOVAL

AND

R

EPLACEMENT

P

ARTS

45

Advertising