22 of 42

11.4 Begin Commissioning

11.4.1 Before Operating the Heater

To ensure that all the controls are in safe working
order, operate the heater for the first time with the
isolating gas valve turned off.

1. Turn off the gas isolating valve

2. Using the installed external control, turn on the

burner. The automatic sequence will now begin
as described

on Page 22, Figure 11.

There will be no ignition of the burner and lockout
will occur, which proves the controls are operating
correctly.

Figure 11: Automatic Burner Control Box Sequence

NOTE: If the heater operates for more than 24 hours continuously, the ignition module will automatically
recycle the burner to ensure that all safety functions are still in working condition.

P

P

Fan Neon

Burner Neon

Neon

Ignition

Gas

Valve

Flame
Sensing

Pressure
Switch

Fan

Thermostat

KEY TO

SYMBOLS

T0

T1

T2

T3

T4

T5

T6

T7

10 sec

Tp

40 sec max.

Interruption of main

Tp

10 sec

Ts

10 sec

flame sensing

11 sec typical

T8

Lockout Alarm
Signal (optional)

Burner Lockout

signal received after

3 ignition trial

failures