5 flue fan vertical installation (models 22 - 32) – Roberts Gorden Compact Tubular Unit Heaters CTCU 27 User Manual

Page 46

Advertising
background image

COMBAT

®

CTCU U

NIT

H

EATERS

I

NSTALLATION

O

PERATION

AND

S

ERVICE

M

ANUAL

40 of 42

16.5 Flue Fan Vertical Installation (Models 22 - 32)

IT IS IMPORTANT THAT ONLY THE CORRECT FLUE FAN SPECIFIED FOR EACH MODEL TYPE IS
USED WHEN REPLACING THESE ITEMS.

Carry out a commission after working on or changing a flue fan.

See Page 25, Section 12.

MODEL

CTCU-22

CTCU-27

CTCU-32

Flue Fan

Sit Controls

P1210838

Sit Controls

P1210838

Sit Controls

P1210838

RG P/N

90710471

90710471

90710471

Air Plate mm Ø

57

57

64

in Ø

2.25

2.25

2.5

RG P/N

12114210

12114210

11114210

1. To remove the fan, remove 5

screws securing the fan/
mounting plate to the vent box.

2. To remove the fan from the

mounting plate, remove the 2
screws.

3. Refit in reverse order.
4. To change the flue and air

intake orientation from back to
top, remove the fan/mounting
plate as explained in Steps 1
and 2.

5. Rotate the motor 90º counter-

clockwise and reinstall the 3
screws.

6. Remove intake and exhaust

cover(s) from top of the heater.

7. Rotate the fan, mounting plate

and gasket clockwise until the
flue adapter lines up with the
top hole. Secure with 5 screws.

8. Discard the piece of duct.
9. Install the intake/exhaust cover

and install the 3" alum-mylar
flex duct (after bending it to a
tight radius by hand).

10.Install intake and exhaust

cover(s) over the holes on the
back of the heater.

11. Ensure sealed joints. Ensure

mounting plate orifice is clear
and not obstructed.

Advertising