Installation, Unpacking, 2 installation – Tandberg Data N3 User Manual

Page 9: 1 unpacking

Advertising
background image

3

2 Installation

Precautions:

Never install communication equipment during a lightning storm.

Never install jacks for communication cables in wet locations unless the jack is
specifically designed for wet locations.

Never touch uninstalled communication wires or terminals unless the communication
line has been disconnected at the network interface.

Use caution when installing or modifying communication lines.

Avoid using communication equipment (other than a cordless type) during an
electrical storm.

There may be a remote risk of electrical shock from lightning.

Do not use communication equipment to report a gas leak in the vicinity of the leak.

The socket outlet shall be installed near to the equipment and shall be easily
accessible.

Never install cables without first switching the power OFF.

This product complies with directives: LVD 73/23/EC and EMC 89/366/EEC.

Power must be switched off before power supplies can be removed from- or installed
into the unit.

2.1 Unpacking

The TANDBERG Gatekeeper is delivered in a special shipping box which should contain the
following components:

Gatekeeper unit

Installation sheet

User manual and other documentation on CD

Rack-ears and screws

Kit with 4 rubber feet.

Cables:

o

Power cables

o

One Ethernet cable

o

One null-modem RS-232 cable

Installation site preparations

Make sure that the Gatekeeper is accessible and that all cables can be easily connected.

For ventilation: Leave a space of at least 10cm (4 inches) behind the Gatekeeper

s rear

and 5cm (2 inches) on the sides.

The room in which you install the Gatekeeper should have an ambient temperature
between 0

o

C and 35

o

C (32

o

F and 95

o

F) and between 10% and 90% non-condensing

relative humidity.

Advertising