General venting – Temco Tool 36RDVN User Manual

Page 10

Advertising
background image

10

RDVN Series Direct Vent Gas Fireplace

20007628

Your fireplace is approved to be vented either through
the side wall, or vertical through the roof.
• Only CFM Corporation venting components spe-

cifically approved and labelled for this fireplace
may be used.

• Venting terminals shall not be recessed into a wall or

siding.

• Horizontal venting which incorporates the twist lock

pipe must be installed on a level plane without an
inclining or declining slope.

Horizontal venting which incorporates the use of flex
venting shall have an inclining slope from the unit of
1” (25 mm) per 24” (610 mm).

General Venting

There must not be any obstruction such as bushes,
garden sheds, fences, decks or utility buildings within
24” from the front of the termination hood.
Do not locate termination hood where excessive snow
or ice build up may occur. Be sure to check vent termi-
nation area after snow falls, and clear to prevent ac-
cidental blockage of venting system. When using snow
blowers, make sure snow is not directed towards vent
termination area.
Location of Vent Termination
It is imperative the vent termination be located observ-
ing the minimum clearances as shown on the following
page.

Advertising
This manual is related to the following products: