3 installation, 1 cubicles, 2 power cabling 3.2.1 shielded motor cable – R&M Materials Handling VARIABLE SPEED CONTROLS ControlMaster Select Service Manual User Manual

Page 12: 2 double collectors, 3 cable selection

Advertising
background image

R&M Materials Handling, Inc.
4501 Gateway Boulevard
Springfield, Ohio 45502
P.: (937) 328-5100
FAX: (937) 325-5319

12/46

R&M Materials Handling, Inc. reserves the right to alter or amend the above information without notice.

3 INSTALLATION

3.1 Cubicles

Wall mounting

Standard cubicle

Cubicle size (mm)

DMHR01F90, External

Braking resistor unit (mm)

002F

-

400 x 400

325 x 170 x 147 (optional)

003F – 004F

EEC25.4025

400 x 400

325 x 170 x 147

Through panel mounting

Standard cubicle

Cubicle size (mm)

D2RP03F21R2S0-6, External Braking

resistor unit (mm)

003F – 004F

EEO25.604

400 x 600

-

005F – 011F

½ CC600E

600 x 1000

-

015F

½ KA220D2

1000 x 1000

-

018F – 022F

KA220D2

1000 x 1000

Included

EEO25.604

250

400

003 - 005

Trough panel

mounted

1000

300

CC600E

630

005 - 011

600

KA220D2

338

1000

015

1000

EEC25.4025

400

250

002 - 004

wall mounted

400

Free

Free

KA220D2

338

1000

018 - 022

1000

D2RP...

3.2 Power

cabling

3.2.1 Shielded motor cable

In crane application inverter fulfills EN61800-3/A11 - second environment radiated emission requirements
without shielded motor cable.

In the second environment, shielded motor cable is recommended to use in fixed installations, especially
in buildings. However motor cables in crane and festoon power supplies are normally not shielded due to
the practical reasons.

3.2.2 Double collectors

If the power is supplied to the crane via conductor rails, double collectors are needed. This ensures a
reliable contact with the rail in all circumstances. Short interruptions and sparks between the conductor
rail and the collector may cause nuisance tripping or other undesired operations and in worst case even
permanent damage to components.

3.2.3 Cable selection

Cabling for inverter can be done using normal crane cables. All the cables must be dimensioned
according to local regulations. Ambient temperature, cabling method (size of bunches etc.) and allowable
current for the cable in use must be taken into consideration. If there are no other regulations, following
values can be used (three phase 400V supply).

Advertising