Astat-cd plus service instructions – GE Industrial Solutions ASTAT-CD Plus Solid-State Starters User Manual

Page 20

Advertising
background image

ASTAT-CD Plus Service Instructions

20

Protection Board

Gate leads

Bottom of Power Supply Board

Gate terminal board

Figure 6. Gate leads, Protection and Power

Supply Boards

Remove the Power Supply Board. Remove
the hex standoffs, nuts and washers from the
Power Supply Board for use on the
replacement board.

Step 15. Reassemble the standoffs to the new Power

Supply Board. Reconnect the gate wires to
the Power Supply Board (terminals 1 to 12)
and reinstall the 4 screws which hold the
Power Supply Board to the black plastic
housing. Refer to (Figure 7) for gate lead
connections.

Step 16. Reassemble the Logic Board, cover and

terminal connectors using steps 7-10.

Figure 7. Gate lead connections

Y = Yellow wire B = Blue wire

SCR pairs are to be twisted to reduce EMI (not shown in sketch).

To replace the Protection Board.

NOTE: POWER MUST BE REMOVED
BEFORE SERVICING.

Step 17. Remove the Cover, steps 1-3, and remove the

(Logic and Power Supply Board assembly) by
removing the 4 screws holding the Power
Supply Board to the black housing. If a
yellow/green wire is connected to the bottom
of the Power Supply Board, it must be
disconnected. Lower the Logic and Power
Supply Board assembly (Figure 8). Remove
the blue and yellow gate wires per steps 13
and 14.

6-point Terminal
Board

Protection Board

6 wire connectors

Power Supply and
Logic Board
assembly

Figure 8. Board location

Mounting Screw

6-point Terminal Board

Protector Board

Wire Connectors

Figure 9. Remove wire connectors

Advertising