Astat-cd plus service instructions – GE Industrial Solutions ASTAT-CD Plus Solid-State Starters User Manual

Page 8

Advertising
background image

ASTAT-CD Plus Service Instructions

8

Step 10. If a yellow/green ground wire is connected to

the bottom of the Power Supply Board, it
must be disconnected. Lower the top of the
Power Supply Board to view the yellow and
blue gate leads to the SCRs (Figure 6).

NOTE: Check the blue and yellow gate wires
for a number marking before removing these
wires. Each gate wire must have a number
marking correlating to the terminal numbers
on the Power Supply Board (1 through 12)
to facilitate reassembly.

Protection
Board

Gate leads

Gate Terminal
Board

Bottom of Power
Supply Board

Figure 6. Gate leads, Protection and Power

Supply Boards

Step 11. Remove the blue and yellow gate wires from

the small 4- point gate terminal boards, 1 on
the component side and 2 on the solder side
of the Power Supply Board, with a small
screwdriver. These wires must be reconnected
to the new Power Supply Board at the proper
numbered terminals for proper operation of
the starter. Remove the Power Supply Board.
Remove the hex standoffs, nuts and washers
from the Power Supply Board for use on the
replacement board.

Remove gate leads

Protection Board

Gate leads

Power Supply & Logic Board assembly

Figure 7. Board location

Replace the terminal connectors through the
plastic cover, onto the connector strips. Make
certain that the terminal connectors snap into
place.

To replace Power Supply Board

NOTE: POWER MUST BE REMOVED
BEFORE SERVICING.

The Power Supply Board location is shown
below (Figure 4). It has gray and orange
transformers visible from the sides.

Step 8 Remove the cover and Logic Board using

Steps 1 - 5.

Power Supply Board

Ribbon cable

Control housing

Figure 4. Removing Logic Board

Step 9. Remove the 4 screws holding the Power

Supply Board to the black plastic housing
(Figure 5).

Screws to
remove

Figure 5. Removing screws holding

Power Supply Board

Advertising