GE Industrial Solutions WattStation Pedestal EVSE Charger Operation and Maintenance User Manual

Page 26

Advertising
background image

WattStation™ EV Charger User Manual

2266

GE Energy

©2012 GE Company All Rights Reserved


From this screen you can select from one of the following options.

Configuration settings tab:

o Common …………….. a variety of settings to configure WattStation functionality

o Authorization ……… settings to configure access control and payment options

o GE Connect ….… settings to configure your WattStation location and time zone

o Modbus ……………….. settings to configure Modbus networking options

o Network ………………. settings to configure your networking and WiFi security options

o Device Info ………….. this tab shows a complete list of all the current configuration

settings.

Diagnostics tab:

o Troubleshooting information (e.g. fault codes) which are also described in Section 8 of

this manual.

Factory Defaults tab:

o This tab provides for the option of restoring the configuration settings back to their

factory default settings.

LLoogg FFiillee ttaabb::

o Reserved for the creation and capture of a diagnostic log file

Network Troubleshooting tab:

o Provides a number of diagnostic commands useful for network setup and for

diagnostics of wired and wireless network problems:

!

Ifconfig – information such as IP address and MAC address for each port

!

Iwlist – scans for available WiFi signals and displays results

!

ping – can be used to test connection to other IP addresses

!

route – shows the contents of the routing tables

Logout tab:

o Don’t forget to logout before exiting your browser as the configuration tool restricts

usage to one logged in user at a time. If you try to login and get a message that
someone else is currently logged in and if you are certain that the last user just forgot
to logout, simply wait one minute and then try to login again.

IMPORTANT!

FFor configuration changes to take effect, the changes must be saved to the configuration file.
This happens on a page by page basis when the submit button is pressed.

In some instances, power to the EVSE must be cycled for the changes in the configuration file to
be implemented. The instruction in blue at the top of each configuration page will indicate
whether or not a power cycle is required to make configuration changes take effect.

Advertising