Arc Vault™ Protection System

Equipment

Installation

© 2011 General Electric All Rights Reserved

19

Figure 4-5 Location of through-bolts

Figure 4-6 Equipment attachment to shipping skids

After completing the installation of the main bus splice bars,

the joint covers may be mounted and secured by a 3/8-16

nylon bolt and polyester flat washer if the bus insulation

option has been supplied with the equipment.

4. INTERCONNECT CONTROL WIRING - Interconnection of

control wiring across shipping splits is accomplished by

connecting to terminal blocks located in the cross-section

wiring trough on top of the equipment.