GE Industrial Solutions Arc Vault Protection System User Manual
Page 27
Advertising
DEH-41483 Rev. 3
Arc Vault™ Protection System
Equipment
Installation
© 2011 General Electric All Rights Reserved
19
Figure 4-5 Location of through-bolts
Figure 4-6 Equipment attachment to shipping skids
After completing the installation of the main bus splice bars,
the joint covers may be mounted and secured by a 3/8-16
nylon bolt and polyester flat washer if the bus insulation
option has been supplied with the equipment.
4. INTERCONNECT CONTROL WIRING - Interconnection of
control wiring across shipping splits is accomplished by
connecting to terminal blocks located in the cross-section
wiring trough on top of the equipment.