Testing and inspection

26

© 2011 General Electric All Rights Reserved

Disch

Charge

Reset the pop out indicator by depressing the yellow

indicator. This procedure may be repeated if desired.

ARC VAULT RELAY

The calibration of the Arc Vault relay trip system is

comprised of the following components.

• Relay
• Current transformers Class C50 or better 5000:5A
• Shunt trip on the tripable device

WARNING

Correct current transformer class and rating is critical

to proper system function.

All control components, except the CT’s and the Shunt trip

are integrally mounted in the Arc Vault Protection System

stack in drawout construction. The Relay is automatically

connected to the device via a drawout secondary

disconnect block.

WARNING

Never disengage the relay without shorting the

Current transformers properly. This will open-circuit

the current sensors, allowing dangerous and

damaging voltages to develop.

FINAL STEPS TO BE TAKEN BEFORE ENERGIZING
EQUIPMENT

The following steps should be taken before energizing the

equipment.

1. Manually exercise all circuit breakers that the, Arc Vault

relay will be controlling, and other operating

mechanisms to make certain they are properly aligned

and operate freely.

2. Conduct an electrical insulation resistance test to make

sure the switchgear is free from short circuits and

grounds. This should be done both phase-to-ground

and phase-to-phase with the switches or circuit

breakers both opened and closed. The Arc Vault Device

shall be in the discharged state. This test should be

performed with a 1000 volt meggar. Disconnect all

control circuits before checking resistance.

3. Upstream breaker must be tested to verify it is

functional and can clear the fault in less than 5 cycles.

WARNING

Upstream breaker is responsible for interrupting arcing

event. Make sure breaker is functional upon trip signal.

Failure to do so may result in death or serious injury.

3A. Verify CTs are properly connected.

4. Check any electrical relays, meters, or instrumentation

to determine that connections are made properly and

the devices function properly.

5. Electrically exercise all electrically operated circuit

breakers, and other mechanisms (but not under load),

to determine that the devices operate properly. An

auxiliary source of control power may be necessary to

provide power to the electrical operators.

6. Make certain that field wiring is clear of live bus and,

where necessary, physically secured to withstand the

effects of fault currents.

7. Check to determine that all grounding connections are

made properly.

8. Remove all debris, scrap wire, etc., from the switchgear

interior before closing the enclosure.

9. Install covers, close doors, and make certain that no

wires are pinched and that all enclosure parts are

properly aligned and tightened.