SECTION 10.

POST EVENT PROCEDURE

If a short circuit event triggers the Arc Vault device and

opens the upstream breaker, perform these steps.

1. Verify upstream breaker has tripped and is open.

2. Check the event indicator light (amber color) in the top

instrument tray. It should be illuminated.

3. If illuminated, an event has occurred and the Arc Vault

device needs to be replaced.

4. Call GE Engineering field services at 888-GE4-SERV

(888-434-7378) or GE Resolve at 888-437-3765and

report an arcing event occurred and an Arc Vault was

installed. Order a replacement Arc Vault device catalog

# GAVDR1.

5. Verify that the arc fault has been cleared.

6. Rack out the Arc Vault device. Refer to SECTION 5.

7. Replace the new Arc Vault device by following the

previous steps in SECTION 5, 6, and 7.

8. Reset the Arc Vault 86 lockout device.

WARNING

Until the new device is installed, full protection is not

available. Relay only protection is available when

resetting the 86 lockout device.