Customize retrofill secondary wiring, Modify akd-5 switchgear compartment – GE Industrial Solutions EntelliGuard R AKD-5 User Manual

Page 16

Advertising
background image

15

EntelliGuard R Circuit Breaker Retrofill AKD-5 Installation Manual DEH-41547 02/12

Customize Retrofill Secondary Wiring

WIRING

Before installing the breaker, the

secondary disconnects must be wired to

the EntelliGuard Breaker.

Wires with wire markers are provided on

the retrofill. Make sure that the

switchgear wiring connection points

match up with the original wiring of the

cubicle. This ensures that all wiring

connections are properly made.

Wrong connections will cause the breaker

to malfunction.

Modify AKD-5 Switchgear Compartment

It must be ensured that the supply power

to the compartment is turned off/

compartment is de-energized for all the

incoming and outgoing circuits of the LVS

prior to any work being conducted on it.

During the installation and related work on

the equipment, it must be ensured that the

operator is using the prescribed PPE for the

specified tasks.

Ensure only qualified personnel install, operate, service, and maintain all electrical

equipment.