EntelliGuard R Circuit Breaker Retrofill AKD-5 Installation Manual DEH-41547 02/12
Related Publications
Publication
Publication Number
Brochure
DEA-532
Snapshot
DEE-543
Installation Manual AKD8
DEH-41549
Installation Manual AKD6
DEH-41548
Installation Manual AKD5
DEH-41547
Accessory: Door Interlock (Door Interlock Kit)
DEH-41529
Accessory Retrofill Doors Assembly
DEH-41563
Accessory: Position Switch Plate & Position Switch Assembly & Wiring (Position Switch Kit)
DEH-41530
Accessory: Neutral Rogowski CT Disconnect (Neutral Assemblies)
DEH-41531
Accessory: Programmer Disconnects
DEH-41532
Accessory: Finger Clusters (Cluster Assemblies)
DEH-41533
Accessory: Secondary Disconnects
DEH-41534
FAQ
DEQ-171
Application Guide
DET-753
Guideform Spec
DET-754
Spare/Renewal Parts Guide
DET-755
Service and Support
In addition to the local field sales office and service teams, GE also has a dedicated Aftermarket team to
assist customers with legacy information, selection, ordering, and upgrading.
Estimated Time to Complete Tasks
It takes about 20 minutes to install a feature-for-feature LSI assembly. This includes racking out the old
breaker, racking in the new breaker, and replacing the door. If new options are desired, or if it’s a 4-wire
LSIG circuit or modifications are needed to the cubicle, then additional time is required. Time also does
not include wiring the secondary disconnect on the retrofill.
Description
Product Specs
General Electric AKD-5 Low Voltage Switchgear is a free-standing assembly of metal-enclosed units
of power circuit breakers and other auxiliary power circuit protective devices. It may also be a part of
a single-ended or double-ended load center unit substation. It’s a draw-out breaker. Figure 1 shows
the retrofill circuit breaker projected out of its cassette.
Figure 2
shows the AK25 retrofill breaker in
the cassette.