GE Industrial Solutions EntelliGuard R AKD-5 User Manual

Page 21

Advertising
background image

20

EntelliGuard R Circuit Breaker Retrofill AKD-5 Installation Manual DEH-41547 02/12

Figure 13. Legacy Indicator Assembly

Figure 14. Bracket Template for
Drilling Holes

5. Slide the bracket (

Figure 14

) up to its fixing location as shown in the illustration (

Figure 15

).

6. Line up the guiding holes (

Figure 16

).

Figure 15. Slide Bracket Up

Figure 16. Line Up Holes

7. Mark the bottom two holes using the bracket as a template.
8. Take the bracket out and drill 0.18-in diameter pilot holes in the frame.

Advertising