GE Industrial Solutions EntelliGuard TU Conversion kits User Manual

Page 18

Advertising
background image

18

SECTION 7 Supplement to GEH-6466

For GE type AK-1-15, AK-1-25 Low Voltage Power Circuit Breakers.

Following text is in addition to Section 4 of GEH5964 after installing the communication harness

Routing the RELT wire harness

1. Route the RELT wire harness (set of 4 wires) along the top

surface of cubicle towards right as shown in figure 28.

2. Secure the wires with wire tie and apply caution label

supplied with kit on both breaker frame & compartment

door.

3. Mount the new Entelliguard

TU on front frame.

4. The other wire harness supplied loose with kit shall be

connected to the RELT wire harness to signal the input or

output.

5. The wires in harness are color coded for input

and output. Yellow and red wires are for input to

trip unit.

Black and white wires are for output from trip

unit.

6. If required to use the power supply harness for

control power supply, rout the 2-wire harness in

same way above RELT wire harness.

Individual wires in power supply harness are color coded

and numbered. The pins should be inserted at correct

places on backside of 36-pin connector. Refer table 12.

7. Refer Entelliguard

TU Installation manual DEH-

4567 for detailed description of input and output

signal requirements.

Figure 28

Figure 29

Wire Colour

Slot in 36 pin

connector

Function

Black

35

24 V DC Supply +

White

36

25 V DC Supply -

Table 11

-

+

Advertising