GE Industrial Solutions EntelliGuard TU Conversion kits User Manual
Page 9
Advertising
9
SECTION 3 Supplement to GEH-5965
For GE type AK-50, AKU-50, AKS-50, AKT-50, AK-75, AK-100 Low Voltage Power
Circuit Breakers.
Following text is in addition to Section 3 of GEH5965
Routing the RELT wire harness
1. Route the RELT wire harness (set of 4 wires) from left of trip
unit mounting plate as shown in figure 11.
2. Secure the wires with wire tie as shown in figure 12 and
apply caution label supplied with kit on both breaker
frame & compartment door.
3. Mount the new Entelliguard
TU on front frame.
4. The other wire harness supplied loose with kit shall be
connected to the RELT wire harness to signal the input or
output.
Figure 11
Figure 12
Figure 13
Advertising