GE Industrial Solutions EntelliGuard TU Conversion kits User Manual

Page 9

Advertising
background image

9

SECTION 3 Supplement to GEH-5965

For GE type AK-50, AKU-50, AKS-50, AKT-50, AK-75, AK-100 Low Voltage Power

Circuit Breakers.

Following text is in addition to Section 3 of GEH5965

Routing the RELT wire harness

1. Route the RELT wire harness (set of 4 wires) from left of trip

unit mounting plate as shown in figure 11.

2. Secure the wires with wire tie as shown in figure 12 and

apply caution label supplied with kit on both breaker

frame & compartment door.

3. Mount the new Entelliguard

TU on front frame.

4. The other wire harness supplied loose with kit shall be

connected to the RELT wire harness to signal the input or

output.

Figure 11

Figure 12

Figure 13

Advertising