SECTION 10 Supplement to GEH-6318, GEH-6319, GEH-6320 & DEH-023
For Westinghouse DB-15, DB-25, DBL-25, DB-50, DB-75, DBL-75, DB-100, DBL-100,
DS-206, DSL-206, DS-416, DSL-416, DS-420 & DS-632 , Low Voltage Power Circuit
Breakers.
Following text is in addition to Section 4 of GEH-6318, GEH-6319, GEH-6320 and DEH-023
Routing the RELT wire harness
1. Route the RELT wire harness (set of 4 wires) from right of
trip unit mounting plate as shown in figure 38. .
2. Secure the wires harness with wire tie to the frame in a
location where it is accessible in switchgear. Figure 39
shows a suggested location. The actual location is
dependent on the configuration of equipment and may
be determined by field engineer.
Generally this RELT wire harness is routed
along with communication wire harness &
tied at the same location as communication
wire harness.
3. Apply caution label supplied with kit on both breaker
frame & compartment door.
4. Mount the new Entelliguard
TU on front frame.
Figure 39
Figure 40
Wire Tie
Figure 38