SECTION 10 Supplement to GEH-6318, GEH-6319, GEH-6320 & DEH-023

For Westinghouse DB-15, DB-25, DBL-25, DB-50, DB-75, DBL-75, DB-100, DBL-100,

DS-206, DSL-206, DS-416, DSL-416, DS-420 & DS-632 , Low Voltage Power Circuit

Breakers.

Following text is in addition to Section 4 of GEH-6318, GEH-6319, GEH-6320 and DEH-023

Routing the RELT wire harness

1. Route the RELT wire harness (set of 4 wires) from right of

trip unit mounting plate as shown in figure 38. .

2. Secure the wires harness with wire tie to the frame in a

location where it is accessible in switchgear. Figure 39

shows a suggested location. The actual location is

dependent on the configuration of equipment and may

be determined by field engineer.

Generally this RELT wire harness is routed

along with communication wire harness &

tied at the same location as communication

wire harness.

3. Apply caution label supplied with kit on both breaker

frame & compartment door.

4. Mount the new Entelliguard

TU on front frame.

Figure 39

Figure 40

Wire Tie

Figure 38