Chapter 2: Installation

GE Energy
Industrial Solutions

Installation

2.1

Getting Ready

2.1.1

Determination of Metering System Requirements

Determine if the application is for a metering system or for a stand-alone meter. If the
application is for a stand-alone meter, proceed directly to the next section. If the
application is for a metering system, then please read Installing the GE Transponder on
page 2–13.

2.1.2

Overview of Meter Wiring

Although this document treats the installation and certification stages separately, this
does not imply that the recommended procedure is to install the entire system at once and
then proceed to certification.

The recommended procedure is to install and certify the system in stages. By doing this,
systematic error can be corrected before it propagates through the entire installation. To
follow the recommended procedure, divide the job up into manageable stages and install
and certify at each stage before proceeding to the installation of the next stage.

For the purposes of this discussion, the colors black, red and blue have been chosen to
distinguish among the three phases of a three-phase network. White is the designated
color of neutral and green is the color of earth ground. Please substitute the correct color
according to local electrical code. For a two-phase installation, ignore the third phase (the
blue phase in the following description).

Failure to follow the proper procedures and reference the correct wiring diagram can
result in damage to the equipment and/or physical harm.