Security screw installation (optional) – CHIEF Short Throw Interactive Series User Manual

Page 18

Advertising
background image

WM210-220-230-240S/SI

Installation Instructions

18

Lateral Shift Adjustment

IMPORTANT ! : The mount covers need to be removed

before proceeding with lateral shift adjustment.

NOTE:

Remove mount covers from the mount following

instructions in Removing Mount Covers section.

1.

Loosen two 1/4-20 x 5/8" hex head cap screws (E) on
underside of mounting bracket. (See Figure 40)

2.

Adjust projector arm laterally to desired position. (See
Figure 40)

3.

Tighten two 1/4-20 x 5/8" hex head cap screws (E)
loosened in Step 1. (See Figure 40)

Figure 40

4.

Return outer covers to the mount following instructions in
Installing Mount Covers section.

Security Screw Installation (Optional)

Wall Bracket Covers

1.

Remove eight #8-32 x 1/2" Phillips pan machine screws (F)
from wall bracket covers. (See Figure 41)

Figure 41

2.

Install eight #8-32 x 1/2" button head security screws (V)
into holes in wall bracket covers. (See Figure 42)

Figure 42

Mount Covers

1.

Remove two 8-32 x 3/8" Phillips pan head screws (AB) from
upper cover. (See Figure 43)

2.

Raise and remove the upper cover from the mount. (See
Figure 43)

Figure 43

1

3

2

2

(E) x 2

1

(F) x 8

(Projector arm not shown

for display purposes)

2

(V) x 8

(Projector arm not shown

for display purposes)

1

(AB) x 2

Upper
cover

2

Advertising