Installation of wall bracket covers – CHIEF Short Throw Interactive Series User Manual

Page 23

Advertising
background image

Installation Instructions

WM210-220-230-240S/SI

23

8.

Route cables through cover mount, projector arm tunnel
and into projector. (See Figure 59)

Figure 59

9.

(Optional) Cables can be tied to inside of mount’s front
cover using cable ties (not included). Route cables near
front cover and wrap cable tie through slots on front cover
and around cables. (See Figure 60)

Figure 60

10. Replace removed cable management covers (if necessary).

Insert one side of cover into groove and press firmly on the
cover on the other side until it snaps into the other groove.
(See Figure 61)

Figure 61

11. Return outer covers to the mount following instructions in

Installing Mount Covers section.

Installation of Wall Bracket Covers

NOTE:

If security screws are going to be used, use the security

screws (V) to install wall bracket covers. See Security
Screw Installation
section for details.

1.

Place wall bracket top caps (C) over top of each wall bracket
arm. (See Figure 62)

Figure 62

2.

Secure wall bracket top caps (C) to wall bracket arms by
installing four #8-32 x 1/2" Phillips pan machine screws (F)
through holes in covers and wall bracket. (See Figure 63)

3.

Place wall bracket bottom caps (D) over bottom of each wall
bracket arm. (See Figure 62)

Cable clips

Cables (example)

Cable tie (not included)

Route through slots and
around cables

9

10

(C) x 2

(D) x 2

3

1

(Projector arm not shown

for display purposes)

Advertising