455 d c, Ontrol, Anel – Controlled Products Systems Group 790919 User Manual

Page 2

Advertising
background image

T

HE

455 D C

ONTROL

P

ANEL

G

ENERAL

D

ESCRIPTION

The FAAC 455 D control panel is used to operate the

following models.

Swing gate operators:

400

412

402

750

422

760

Barrier gate operators:

610/615

The 455 D programming controls the following:

Operating logic: A, S, E, EP, B, and C logics
available.

Reversing device behavior: Choose whether a
triggered reversing device during closing

immediately reverses gate movement or stops the

gate and reverses gate movement when no longer

triggered.

Torque or Pressure: Force adjustment for the 412
operator. Adjustable from 0 to 50.

Caution: For all hydraulic operators, the torque
must be programmed to the maximum (50) setting.

Pause time between opening and closing:
adjustable from 0 to 240 seconds.

O p e n i n g / C l o s i n g t i m e : a d j u s t a b l e

from 0 to 120 seconds.

Leaf delay on closing: adjustable from 0 to 4.1
minutes.

The 455 D control panel should be installed in an

enclosure that is conveniently located as close as

possible to the gate operator. All electrical connections

from the control panel to the operator must be made in

a weatherproof junction box.

The 455 D control panel requires a single-phase power

supply voltage (115 VAC [±10%] or 230 VAC [+6 or -

10%], 50–60 Hz). The power supply should be protected

by a 15 amp dedicated circuit breaker (not provided).

The installer is responsible for grounding the

operator system, for providing the main power

breaker switch, and for making sure that the entire

gate system meets all applicable electrical codes.

The installer should refer to the installation manual

for a given operator for more information.

N

OTE

: An installation is U.L. compliant only

when you install the FAAC operators according

to the UL325 standards.

I

NSTALLING

THE

455 D C

ONTROL

P

ANEL

Locate the control panel in the most convenient position

possible, considering the movement of the gate.

Installing the control panel consists of the following

general steps:

Connecting the main power to the control
panel

Connecting the activating device

Connecting the operator to the control panel

Checking the direction of the motor's rotation

Connecting other devices to the control panel

Set operating modes

C

ONNECT

THE

M

AIN

P

OWER

S

UPPLY

WARNING!

Turn the main power off before you

make any electrical connections or before

programming.

Wire the main power supply to control panel terminals

in block J3 (see Figures 1 and 2). The installer is

responsible for insuring that a separate, grounded

circuit protected by a circuit breaker is between the

control panel and the main power supply. All wiring

should conform to applicable electrical codes, and all

wiring and fittings should be weatherproof and/or

suitable for burial.

Connect the ground to the grounding terminal in block

J3 and connect the power wires to the terminals labeled

N (neutral) and L (line).

N

OTE

: For a 230V system, a neutral is not

needed. Connect one 115V line to the L (Line)

and a second 115V line to the N (Neutral).

Page 2

November, 2003

455 D Control Panel Installation Instructions

Advertising