7 orion - manifold, panel installation, Orion - manifold, panel installation – Condec UPS3210 User Manual

Page 37

Advertising
background image

Maintenance & Service

33

11. Using the .050" hex wrench, install and tighten the lock nut (2) and set screw (34).
12. Install the Knob Insert (4) over the Valve Needle (11) shaft, align the Set Screws (23) with the indents

and tighten with the .061" hex wrench.

13. For the Isolation Valves, (two inner valves), Install the Needle Housing (19) and tighten until snug using

the Isolation Valve Housing Installation Socket (PN 68509) and Torque wrench.

NOTE: There is no specified torque, so use care when tightening so as not to break the socket nibs.

14. Install the Gear (4) over the Isolation Valve Needle (18) shaft, align the Set Screws (26) with the indents

and tighten with the .061" hex wrench.

15. Apply a small amount of fluorinated Krytox grease to the threads of the isolation valve needles (18) and

install into the valve by turning counter-clockwise. Rotate the gear until the needle just stops at the seat.

4.2.7

ORION - Manifold, Panel Installation

ORION 2C: Refer to “ORION 2C Valve Assembly Parts List” on page 45 and Figure 4-1 on the following
foldout 11 x 17 sheet.

ORION 3A: Refer to “ORION 3A Valve Assembly Parts List” on page 47 and Figure 4-2 on the second foldout
11 x 17 sheet.

Tools required:

7/16" Open end wrench
Phillips screwdriver
Hex wrench (.061")
Snoop, liquid leak gas detector (PN 64781)

11/32" Open end wrench (thin)

1. If not already done, remove the panel knobs from the

INPUT

(pressure),

VERNIER

and

VENT

valves using

the .061" hex wrench.

2. Install the manifold with the transducer port side facing the panel bottom. Install the two mounting

screws (PN 60837) from the panel front and tighten until snug.

3. Secure the chassis to the panel with the 4 nuts and tighten until snug.

4. Install the Vernier Knob (17) onto the Vernier Valve Shaft (14). Align the set screws (25) with the

indentations on the Vernier Valve Shaft and tighten until snug using the .061" hex wrench.

5. To install and adjust the

INPUT

(pressure) and

VENT

Valve Knobs, follow the procedure in Section 4.2.8

for Orion 2C or Section 4.2.9 for Orion 3A.

6. Install the Transducer into the manifold port, tighten with the 11/32" thin wrench and reconnect its wire

connector.

NOTE: If transducer is hard-wired, connect the 4 wires to the Terminal block, TB1, on the CPU board per the following:

Table 4-2. Transducer Wiring Specification

7. Install all tubing sections that attach to the Orion manifold.

8. Install cover on its enclosure as described in Section 4.2.1 on page 28.

Transducer Wires

Terminal Block Wires

+ Excitation

TB1-4 Green wire

- Excitation

TB1-7 Black wire

+ Signal

TB1-5 White wire

- Signal

TB1-6 Red wire

Temp Sense (If applicable)

TB1-3 Blue wire

Advertising
This manual is related to the following products: