Page 56

 

To begin, sufficient seed must be placed
in the hopper above the meter to be
calibrated to ensure full flow during the
calibration procedure. A catch bin of
known weight must be placed under the
meter. The calibration requires meter
revolution input and speed input. A
separate calibration must be done for
each meter

 
 
 
 
 
 
 

3. “Start Calibration” is now
highlighted. Press “SELECT”.

 
 
 
 
 
 

4. The screen now displays the
number of meter revolutions
counted with “Continue
Calibration” highlighted. Turn the
meter a number of revolutions
while catching the metered
material in the catch bin. Stop
turning the meter.

NOTE: There is no set number of

cranks required. For
smaller seeds crank out a
larger sample.

 
 
 
5. The number of revolutions is
displayed. Press SELECT to save
the information collected during the
calibration procedure.