Quick start guide – AW Gear Meters RT-10 User Manual

Page 5

Advertising
background image

RT‐10 Flow Monitor

 

Operation and Programming Manual 

 

 

 

      
 

Quick Start Guide 

 

As with any precision‐engineered device, always use the RT‐10 in accordance with the manufacturer’s 
instructions. 

Installation 

Secure appropriate sensor onto RT‐10 Flow Monitor. Place flow monitor with sensor into fitting in flow 
meter.  

 

Before attaching the RT‐10 Flow Monitor to the flow meter, note any potential clearance issues.  

Power  

A lithium battery provides the power to the RT‐10. To replace the battery, refer to Changing the Battery 
on page 21.  

Program K‐Factor  

You must progam the K‐factor for the RT‐10 to operate. Refer to page 15. 

 

 

Caution 

Notice 

Advertising