3. Click Preferences.

4. Click Comm Settings, and then click the Port Number menu.

5. Scroll down to find the correct COM port address. Click the check mark to accept

the changes.

6. Click the yellow Connect button in the lower right corner to establish a connection

to the instrument.

Performing a Power Cycle (Resetting the Modem) - 1 W Solar

Improperly cycling power may cause electrical issues. Follow the
proper procedure step-by-step to avoid damaging equipment.
Procedures vary by solar panel type.

1. Disconnect the black (negative) lead from the black battery terminal of the TROLL

Link enclosure.

2. Disconnect the white (positive) lead of the solar panel wire from the enclosure

screw terminals.

3. Reconnect the white lead of the solar panel wire to the enclosure terminal labeled

SOL+.

4. Reconnect the black lead to the black battery terminal.

Performing a Power Cycle (Resetting the Modem) - 10 or 20 W Solar

Improperly cycling power may cause electrical issues. Follow the
proper procedure step-by-step to avoid damaging equipment.
Procedures vary by solar panel type.

1. Disconnect the black (negative) leads from the black battery terminals of the

external battery kit enclosure.

2. Disconnect the black lead from the black battery terminal of the TROLL Link

enclosure.

3. Disconnect the white (positive) lead of the solar panel wire from the enclosure

screw terminals.

4. Reconnect the white lead of the solar panel wire to the enclosure terminal labeled

SOL+.

5. Reconnect the black lead to the black battery terminal of the TROLL Link enclosure.

6. Reconnect the black leads to the black battery terminals of the external battery kit

enclosure.