Takagi T-M32 User Manual

Page 13

Advertising
background image

- 13 -

Horizontal Installation Diagram

















Vertical Installation Diagram




























• Regarding the clearance from the terminator to the air inlet or opening, refer to the next

page.

• Install a condensation drain in the venting.
• Follow the vent system to vent manufacturer’s instruction and local code.
• Do not common vent or connect any vent from other appliances to the T-M32 vent.
• Use 4” category III approved or Special BH, single or double wall stainless steel vent

pipe.

Wall

Roof

Rain Cap

Roof Flashing

Sidewall Vent
Terminator

Vertical Condensation Drain
(Install according to local codes)

TK-BF01 Backflow preventor
(Recommended for freezing
weather conditions: 36°F and
below)

TK-BF01 Backflow preventor
(Recommended for freezing
weather conditions: 36°F and
below)

Vertical Condensation Drain
(Install according to local codes)

Advertising