Selecting self-tests to be performed – AMCC 3WARE 720-0138-00 User Manual

Page 88

Advertising
background image

Chapter 6. Maintaining Units

80

3ware Serial ATA RAID Controller User Guide for the Power Mac G5

To add a task schedule slot

1

Choose

Management > Schedule

from the menu bar.

The Scheduling page appears, showing the schedule for Rebuild/Migrate
Tasks.

2

To view Verify Tasks or Self-test Tasks, select it from the drop-down list
at the top of the page.

3

Scroll to the section of the Scheduling page that shows the task you want
to add.

4

In the fields at the bottom of the section, select the Day, Time, and
Duration for the task.

5

Click the

Add New Slot

button.

The page refreshes and the new schedule is added to the list.

Selecting Self-tests to be Performed

Two self-tests can be set: one to check whether UDMA Mode can be
upgraded, and another to check whether SMART thresholds have been
exceeded. (For more information about these self-tests, see the 3DM
Reference section, “Scheduling page” on page 97.)

Initially, these tests are set to run every 24 hours. You can change the schedule
for when they are run, and you can disable the tests, if you prefer not have to
have them performed.

To select self-tests to be performed

1

Choose

Management > Schedule

from the menu bar.

The Scheduling page appears, showing the schedule for Rebuild Tasks.

2

Select Self-test Tasks from the drop-down list at the top of the page.

Note:

The scheduled tasks can be added in any order. For example a new task

scheduled for Tuesday (slot-2) will preempt the task originally scheduled for
Wednesday (slot-1).

Note:

These tasks will only be run during scheduled times if they are checked in

the Schedule Self-tests

section of the Scheduling page. If neither of the tasks is

checked, self-tests will never run, even if you have scheduled time slots set.

Advertising