HP StorageWorks XP Remote Web Console Software User Manual

Page 111

Advertising
background image

Figure 53 Overview of Operation to Replace All the Current Alternate Paths with Newly-added Alternate
Paths

.

To replace all the current alternate paths (A and B) with newly-added alternate paths (C and D):

1.

Execute the Disconnect Paths command on the alternate path A (see 5.16).

2.

Disconnect the cable which the alternate path A uses, and connect the cable which the alternate
path C uses.

3.

Cancel the configuration of the alternate path A, and add the alternate path C (see 5.5.4).

4.

Click the Apply button to apply the settings of the alternate paths A and C.

5.

Make sure the status of the alternate path C is Normal.
At this point, the alternate paths B and C are configured as normal paths.
Take the following steps to delete the alternate path B and add the alternate path D.

6.

Execute the Disconnect Paths command on the alternate path B (see 5.16).

7.

Disconnect the cable which the alternate path B uses, and connect the cable which the alternate
path D uses.

8.

Cancel the configuration of the alternate path B, and add the alternate path D (see 5.5.4).

9.

Click the Apply button to apply the settings of the alternate paths B and D.

10.

Make sure the status of the alternate path D is Normal.

XP External Storage Software User Guide

111

Advertising
This manual is related to the following products: