5 cabinet mounting, Cabinet mounting – ADC ACE-142S/142V User Manual

Page 13

Advertising
background image

ADCP-96-015 • Issue 1 • July 2004

Page 7

© 2004, ADC Telecommunications, Inc.

Concrete Pad Installations

• Pad Mount Frame kit for ACE-142

• Excavation and earth moving equipment

• Concrete finishing equipment

• Approximately 10 cu. ft. concrete

• Sand or gravel

• Tamping equipment

• 2 x 6 inch framing lumber

• 1 x 4 inch wooden stakes (4)

• Nails and construction screws

• Utility wire (to secure PMF during installation)

• Saw

• Drill with screwdriver bits

• Square

• Level

• Landscaping equipment and site restoration supplies

2.5

Cabinet Mounting

The next two sections provides instructions for mounting the cabinet on either a fiberglass
mounting sleeve or concrete pad. Use whichever procedure is appropriate for the installation.

Advertising