2 bottom cover installation, Bottom cover installation – ADC ACE-142S/142V User Manual

Page 38

Advertising
background image

ADCP-96-015 • Issue 1 • July 2004

Page 32
© 2004, ADC Telecommunications, Inc.

6.2

Bottom Cover Installation

The cable-entry section of the bottom cover must be replaced following installation of the
grounding wire, feeder cable(s), and distribution cable(s). Use the following procedure to
replace the cable-entry section of the bottom cover:

1. Locate the bottom cover (cable-entry section) that was removed from the cabinet in step 2

of

Section 5.1

.

2. Determine which grommets will be used for sealing the cable entry/exit points and remove

those grommets from their mounting slots in the bottom cover.

3. Using a utility knife, cut through the slit that runs lengthwise down the center of each

grommet as shown in

Figure 24

.

4. Remove enough cable cutout sections from each grommet to accommodate the size and

number of cables that will pass through the grommet.

Figure 24. Bottom Cover Installation

5. Install the grommets on the cables.

6. Insert the grommets into their respective mounting slots in the bottom cover.

Note: More than one cable may have to pass though the same grommet.

19609-A

DISTRIBUTION

CABLES

GROMMET

BOTTOM

COVER

FEEDER

CABLE

GROUNDING

WIRE

DETAIL DRAWIING

OF GROMMET

CUT SLIT

REMOVE CABLE

CUTOUT SECTIONS

Advertising