ADCP-96-015 • Issue 1 • July 2004

Page 39

© 2004, ADC Telecommunications, Inc.

Figure 31. Routing Subunit A Around Front Side of Splice Tray

8. Secure subunit B to the splice tray at the points shown in

Figure 32

. If multiple fibers are

being installed, route all fibers simultaneously.

9. Adjust subunit B so the fiber breakout is positioned at the point shown (see

Figure 32

).

10. Route the breakout fibers at least two times around the inside of the tray making the loop

as large as possible to ensure maximum fiber storage.

11. Splice the subunit A fibers to the subunit B fibers as specified by local policies and

procedures.

12. Replace the splice tray top cover and then turn the splice tray in a clockwise direction to

roll up the excess slack.

13. Return to step 10 in

Section 5.4

or step 8 in

Section 6.3

to complete the corresponding

OSP cable installation procedure.

Note: If installing the feeder cable, subunit B is the splitter input fiber(s). If installing the
distribution cable, subunit B is the distribution cable subunit.

TOP SIDE

ROUTE FIBERS 1.5 TIMES

AROUND INSIDE OF TRAY

MAKE LOOP AS LARGE AS

POSSIBLE TO ENSURE

MAXIMUM FIBER STORAGE

19230-A