Section 4.6.2, Figure 10 – ADC ACE-142S/142V User Manual

Page 25

Advertising
background image

ADCP-96-015 • Issue 1 • July 2004

Page 19

© 2004, ADC Telecommunications, Inc.

Figure 10. Mounting the ACE-142S Cabinet on the Concrete Pad

7. Using appropriate lifting equipment, hold the cabinet in position for mounting over the

ground spacer or PMF.

8. Lower the cabinet onto the ground spacer or PMF and align the mounting holes in the

cabinet base with the threaded holes in the spacer or PMF.

9. If the installation includes a ground spacer, secure the cabinet to the spacer using the four

hex bolts, four flat washers and four nuts provided with the spacer. If the installation does
not include a ground spacer, secure the cabinet to the PMF using the four hex bolts, lock
flat washers, and four flat washers provided with the cabinet. Tighten all fasteners securely.

4.6.2

Mounting the ACE-142V Cabinet on a Concrete Pad

Use the following procedures to mount the ACE-142V cabinet on the concrete pad.

1. Remove the plastic plugs that are installed in the threaded corner holes of the PMF and

clean off any concrete that may have adhered to the top of the PMF.

ACE-142S

CABINET

(FRONT)

CABLE

CONDUIT

19617-B

CONCRETE

PAD

PAD MOUNTING

FRAME (PMF)

CAPSCREWS, LOCK

WASHERS, AND FLAT

WASHERS (4 PLACES)

GROUND

SPACER

(ACCESSORY)

HEX BOLTS, FLAT

WASHERS, AND

NUTS (4 PLACES)

Advertising