Testing the communications line -24, 27 testing the communications line – ADC RS-232/V24 User Manual

Page 99

Advertising
background image

ADCP-50-304 • Issue 19 • June 1999 • Section 7: Operation

Page 7-24
© 1999, ADC Telecommunications, Inc.

l7,2000 If no change in status occurred in the SwitchMate System, the CM cannot execute the

UP command.

18,1000Parameter syntax error in AB command.

19,1001Invalid action parameter in AL command.

19,l002 Invalid cardtype parameter in AL command.

19,1003Invalid startslot number in AL command.

19,1004Invalid endslot number in AL command.

19,1005Startslot number is greater than endslot number in AL command.

6.27 Testing The Communications Line

Once a chassis is activated by a terminal, the user may test the quality of the communications
line transmission by sending a message (test data) or random character string to the selected
chassis. The test data string must include an echo command flag before sending the LF
termination character. All character strings entered containing a “$” sign character and
terminated with a LF, are returned to the issuing terminal. Because the selected PS chassis does
not act upon data received until a GO command is recognized, no error is indicated. If a GO
command is executed and the data previously sent to the chassis is invalid, the CM responds
with an error message.

If the test data contains a “#” character, an error message is immediately returned to the
originating remote control device.

Advertising
This manual is related to the following products: