Testing the switch-to-adjunct link – Avaya S8300 User Manual

Page 416

Advertising
background image

Telephones and adjunct systems

416 Installing and Upgrading the Avaya G700 Media Gateway and Avaya S8300 Media Server

Testing the switch-to-adjunct link

You can use the test, status, busyout and release commands to find and correct problems with
CDR links. For more information about these commands, see Maintenance Commands for
Avaya Communication Manager 3.0, Media Gateways and Servers
, 03-300431.

Work with the vendor to test the link from the call accounting adjunct.

If a link does not come up immediately, use the busyout cdr-link and release cdr-link
commands to bring up the link.

Additional administration procedures for CDR equipment are provided in the Administrator
Guide for Avaya Communication Manager
, 03-300509.

status cdr-link

CDR LINK STATUS

Primary

Secondary

Link State: up

extension not administered

Maintenance Busy? no

Advertising
This manual is related to the following products: