Complete the installation process, For an s8300 lsp) – Avaya S8300 User Manual

Page 543

Advertising
background image

Complete the Installation Process (for an S8300 LSP)

Issue 9.1 June 2006

543

Complete the Installation Process
(for an S8300 LSP)

Consult the planning documentation to obtain the necessary information to complete the
installation.

Part of the final process will be to:

Connect and administer test endpoints

Test endpoints

Complete the electrical installation

Enable adjunct systems

This completes the installation of the G700 Media Gateway with an S8300 LSP.

Advertising
This manual is related to the following products: