Complete the upgrade process, S8300 is the primary controller), To check media modules – Avaya S8300 User Manual

Page 663: To enable scheduled maintenance, To busy out trunks, To check for translation corruption, To resolve alarms

Advertising
background image

Post-upgrade tasks

Issue 9.1 June 2006

663

Complete the upgrade process
(S8300 is the primary controller)

In an SSH session to the S8300 (primary controller), access the SAT command line interface to
complete the following procedures.

To check media modules

1. Type list configuration all and press Enter.

2. Verify that the software is communicating with all media modules and that all media

modules are listed in the reports.

3. Make test telephone calls to verify that Communication Manager is working.

To enable scheduled maintenance

1. Type change system-parameters maintenance and press Enter.

2. Ensure that the Start Time and Stop Time fields' administration is the same as before the

upgrade.

To busy out trunks

1. Busy out trunks that were busied out before the upgrade (see

Pre-Upgrade Tasks — If the

S8300 is the primary controller

on page 604).

To check for translation corruption

1. Type newterm and press Enter.

If you do not get a login prompt and see the following message:

Warning: Translation corruption detected

follow the normal escalation procedure for translation corruption before continuing the
upgrade.

To resolve alarms

1. On the Maintenance Web Interface, under Alarms click Current Alarms to examine the

alarm log.

2. If any alarms are listed, click Clear All.

3. Resolve new alarms since the upgrade through Communication Manager using the

appropriate maintenance reference.

Advertising
This manual is related to the following products: