Summers Superchisel - 3-Section User Manual

Page 43

Advertising
background image

2-31

SECTION 2 – SET-UP OF 32’ BASE MACHINES (32’-38’)

9. Install optional wing extensions.

– One-shank extension must be placed on rear rank.

– Two-shank extension must be placed on middle two ranks.

– Three-shank extension with gauge wheel plate must be attached to the first and second

rank.

– Mounting bolts must point toward outside of machine. (Trip assembly interference will occur

if this is not followed.)

10. Install gauge wheel support (8T4090) onto wing with 7/8 x 2-1/2” bolts.

NOTE: Steps 10 through 15 may have been pre-assembled at factory.

11. Apply anti-seize to jack bolt (8T6000) threads. Screw jack bolt into axle holder (8T4094) far enough

to see hole on bottom of bolt through hole in axle holder.

– Insert 3/16 x 2” roll pin. Insert pin far enough so it will clear tube when rotated.

12. Place gauge wheel depth decal on axle holder.

– Locate decal 1” from bottom of 4 x 4 tube.

– Make sure that decal faces the front of the machine.

– Decal should be placed off to one side of axle holder to avoid seam on support tube.

13. Slide axle holder and jack bolt into gauge wheel support. Slide 1-1/4” flat washer onto bolt and

turn 1-1/4” slotted nut on.

– Do not tighten slotted nut.

14. Add gauge wheel screw top onto jack bolt.

– Insert 1/2 x 2-1/4” bolt into screw top and bolt, secure with locknut.

15. Attach gauge wheel jack handle to screw top.

– Install 3/8 x 2” bolt in handle and screw top. Secure with lock nut.

– Do not over tighten. Handle must pivot freely.

Advertising