B - Verification and Calibration

60

Test Setup

Figure B-1 shows the setup for the tests. Be certain to use load leads of sufficient wire gauge to carry the
full output current (see Chapter 2).

Figure B-1. Verification & Calibration Test Setup

Performing the Verification Tests

The following procedures assume you understand how to operate the ac source from the front panel as
explained in Chapter 4.

When performing the verification tests from a GPIB controller, you may have to consider the relatively
slow settling times and slew rates of the ac source as compared to computer and system voltmeters. Insert
suitable WAIT statements into the test program to give the ac source time to respond to test commands.

Perform the following tests for operation verification in the order indicated.
1.

Turn-On Checkout

2.

Voltage Programming and Measurement Accuracy

3.

Current Measurement Accuracy

Turn-On Checkout Procedure

Perform the Turn-On Checkout as directed in Chapter 3.

NOTE:

The ac source must pass turn-on selftest before you can proceed with the verification
tests.

L1

L2

L3

O1

O2

O3

COM

O1

O2

O3

COM

AC INPUT 3 phase

180-254 VAC line to line

or

360-440 VAC line to line

R

shunt

LOAD

R

LOAD

R

LOAD

S1

S2

S3

Switch is for
convenience,
not required.

1

30

RMS
VOLTMETER

CAUTION: Connect only one phase at a time

shunt

shunt

RMS
VOLTMETER

R

IMPEDANCE

A. VOLTAGE SETUP