2.3 Tower Installation

Properly assemble the tower according to instructions (do this where the

tower is to be put up).

Once the tower is up in the full vertical position, securely fasten it to the

base using 5/8-inch nuts and washers.

Ground the tower according to the National Electrical Code.

3. Initial Inspection

3.1 Indoors

Immediately upon receipt of your shipment…

o Open shipping cartons.

o Check contents against invoice. Contact Campbell Scientific

immediately about any shortages.

Several days prior to the planned installation date…

o Collect tools and site information (Section 3.3, Tools Required, and 4,

Siting and Exposure).

o Assemble datalogger, communications device, and power supply in

enclosure (Section 8, Preparing the Tower for Use).

o Install datalogger support software on PC (Section 10, Standard

Software Installation).

o Establish communications between the datalogger and the PC (Section

10, Standard Software Installation).

o Program datalogger, test sensors, and retrieve data (Section 10,

Standard Software Installation).

o Trial run the tower / tripod installation, assembling as much as

possible (Section 7, UT20/UT30 Tower Installation).

o Repackage equipment for transport to the field site.

3.2 Outdoors

Locate suitable site (Section 4, Siting and Exposure).

Prepare tower base (Section 7, UT20/UT30 Tower Installation).

o Install 3 to 10 meter level sensors (Section 8.5, Sensor Installation).

o Raise tower (Section 7, UT20/UT30 Tower Installation).

o Install instrumentation enclosure (Section 7, UT20/UT30 Tower

Installation).

o Install 0 to 3 meter level sensors (Section 8.5, Sensor Installation).

2