8. Preparing the Tower for Use

8.1 Enclosure, Datalogger, Power Supply

8.1.1 Enclosure

All instrumentation (datalogger, power supply, and communication

peripherals) are mounted in the enclosure. A PVC bulkhead port is installed in

the enclosure for routing the sensor and communication cables to the

instrumentation.

The “-TM” option is used to attach our enclosures to a UT20 or UT30 tower.

An enclosure ordered with the “-TM” option will be shipped with a three-piece

bracket mounted to the top of the enclosure and an identical three-piece bracket

mounted to the bottom of the enclosure. This mounting bracket option uses the

same three-piece brackets as the “-MM” option, except the pieces are

rearranged so that the flanges are on the side of the bracket instead of in the

middle. The distance between the centers of each flange needs to be 17 inches

(see FIGURE 8-1, FIGURE 8-2, and FIGURE 8-3).

Enclosures with the “-TM” option are shipped configured for the

UT10 tower. Steps 1 through 3 of the following procedure are for

configuring the bracket for attachment to a UT20 or UT30 tower.

Attach the enclosure to a UT20 or UT30 tower as follows:

1. Remove the bolts and nuts connecting the bracket to the enclosure.

2. Slide out the flange sections so that the distance between the centers of

each flange is 17 inches (see FIGURE 8-1).