ATEN CL-1208 User Manual

Page 22

Advertising
background image

5. Power up the installation according to the following procedure:

a) Power on the First Station (CL-1208 or CL-1216).

Wait a few seconds for the unit to ascertain its Station ID.

b) Plug in the power adapters for each daisy chained Station on the

installation in turn (Second Station, then Third Station, etc.). Each
ACS-1208A / ACS-1216A has a LED display on its front panel to
indicate its Station ID (the Station ID for the First Stage unit is 01, the
ID for the Second Stage unit is 02, the ID for the Third Stage unit is
03, etc.).

In each case, wait for the Station ID to be ascertained and displayed on
the Station ID LED before plugging in the next Station.

c) After all the Stations are up, power on the computers.

2005-04-26

CL-1208 / CL-1216 User Manual

14

Advertising
This manual is related to the following products: