Running the test, 4 running the test, Pre-test summary – Agilent Technologies EN 61000-3-2 User Manual

Page 27: Pre-test power statistics

Advertising
background image

27

4

Running the Test

Before actual test data can be acquired, the pre-test must be run. This is accomplished in the Pre-Test
window. As its name implies, the Pre-Test window centralizes functions that, following test setup, need
to be performed prior to running an actual test. This includes running preliminary tests to measure
quantities that are subsequently used to set test limits for Class C and Class D devices. Once the pre-test
data is available, the main test can be started. This is accomplished in the Test window. Test status
information is displayed in the Status bar on the bottom of the screen. Note that you must always have
pre-test results present before running the main test.

To Run a Pre-test for Quasi-stationary or Fluctuating
Harmonics

Pre-Test Summary

1. Select the Pre-test menu tab on the bottom of the screen to access the Pre-test Summary

window. You can also access the Pre-test window from the View/Pre-test menu.

2. If desired, change the time delay from when power is applied until the pre-test is run. The default

pre-test time is 10 seconds.

Advertising
This manual is related to the following products: